Jump to content
Sign in to follow this  
DC Power Kyle

DC Power Engineering June 2011 Giveaway

Recommended Posts

Alright everyone, we are deciding to give away a White iPad 2 16GB to one lucky customer that purchases something from us in the month of June thats $250 or more. It's plain and simple and there is NO catch. Simply place an order and we will do a drawing at the end of the month and someone will be getting an iPad 2 sent to their door. You can do this by placing an order over the internet OR by calling us. Everyone is automatically entered.

Cheers! :morepower1:

Share this post


Link to post
Share on other sites

Thanks for the nice giveaway fellas, need to save up some cash to take advantage.

Share this post


Link to post
Share on other sites

Woot woot.

Is your wire on the website?

Share this post


Link to post
Share on other sites

Nice!!

Share this post


Link to post
Share on other sites

awesome prize!!! I can has internet in bed now???

Share this post


Link to post
Share on other sites

Hmm... I think o need to get my cash together.

Kyle, you guys have the 270xp for the 1mz Camry yet? I know you guys are/were redesigning the case. Lmk. And I might place an order for it. :)

Share this post


Link to post
Share on other sites

An order for my bimmer will be made but not until prob later in the year :(

Share this post


Link to post
Share on other sites

I should win i-pad :dancing: I placed my order #1200000548 in april, but still waiting my alternator. And no one from DC contacted me at least last two weeks. Good customer service guys. :jon: i think you are very busy with my alternator.

Share this post


Link to post
Share on other sites

Bump for possible availability of my 270xp for Camry v6 1mz?

Bump for him ^^

Share this post


Link to post
Share on other sites

The problem with the 1MZ situation is there is really no easy way to do it without making a billet casing. We have it in the queue of cases to do, unfortunately it's a couple of months out. We were trying to find something close to match it to with an easier bracket, but there isn't really close. The one 1MZ XP we did was my previous car. the bracket was a single mock up job and took over 4 hours to get it to "fit" not to mention it taking all day on the fabrication. We also don't have that bracket anymore as well. Everyone unfortunately is just going to have to hold on until we make the billet casings for 1MZ-FE. This will make for a clean direct fit with no frustrations that we dealt with.

Share this post


Link to post
Share on other sites

The problem with the 1MZ situation is there is really no easy way to do it without making a billet casing. We have it in the queue of cases to do, unfortunately it's a couple of months out. We were trying to find something close to match it to with an easier bracket, but there isn't really close. The one 1MZ XP we did was my previous car. the bracket was a single mock up job and took over 4 hours to get it to "fit" not to mention it taking all day on the fabrication. We also don't have that bracket anymore as well. Everyone unfortunately is just going to have to hold on until we make the billet casings for 1MZ-FE. This will make for a clean direct fit with no frustrations that we dealt with.

Damn... well can you say for sure it will be done before the end of sept?

That's about when I hope to be done.

Share this post


Link to post
Share on other sites

The problem with the 1MZ situation is there is really no easy way to do it without making a billet casing. We have it in the queue of cases to do, unfortunately it's a couple of months out. We were trying to find something close to match it to with an easier bracket, but there isn't really close. The one 1MZ XP we did was my previous car. the bracket was a single mock up job and took over 4 hours to get it to "fit" not to mention it taking all day on the fabrication. We also don't have that bracket anymore as well. Everyone unfortunately is just going to have to hold on until we make the billet casings for 1MZ-FE. This will make for a clean direct fit with no frustrations that we dealt with.

Damn... well can you say for sure it will be done before the end of sept?

That's about when I hope to be done.

Couldn't you see if someone could fab up a dual mount and just get a second stock alt? Just an idea... Since it will cost you maybe less and it can maybe be done quicker??? Does it look like enough room is there???

Share this post


Link to post
Share on other sites
Sign in to follow this  

×