A customer ordered four 15s and I am just about done with the first so I took a few pictures along the build process : * Rear triple joint glue and ring - the ring is smaller than the gap and centered so can go down into the gap at extremely high rearward throw. * Close-up of the glue. * Spider pack is pressed with a laser cut steel plate and a Z v.2 motor to ensure good bonding of the glue between the frame and spider layers. * Terminals have a locking toothed washer * Soldered - and a dab of glue added to the stud on top of the nut and washer for long term safety. * Special surround glue - dries flexible and won't hurt the surround material. * Finished cone to spider joint. * Top triple joint ring initial placement. * Some glue added. * Final glue bead. * Leads fully encapsulated. * Leads placed into the cone - care taken to allow adequate slack for high excursion. Suffice to say the NS v.2 is put together quite well.