Jump to content
Sign in to follow this  
Pyro_By_Nature

Received a confusing label

Recommended Posts

they are very busy bro. they will help you out, but they have to see the thread first. give them some time bro.

sometimes it takes like a week for them to catch a thread.

Share this post


Link to post
Share on other sites

Hmmm... not sure what is going on there. We will not make a high Xmax 3 magnet BTL with the SPL motor tolerences. The coil is simply too long to work properly with that. I know I didnt machine one, nor would I. I am sure that someone simply marked that by mistake on the label. As for the coils, that is indeed the high Xmax coil. They are aluminum round wire and not copper, although they are copper colored (this is the color of the enamel on the wire and not the wire itself).

Ill check all the email and spam filters to see if I can find one from you. Im not sure your real name and we move quite a few BTLs so not sure where to begin there... give me a little bit and Ill see if I can find your order or who you are.

Thanks,

Scott

Share this post


Link to post
Share on other sites

OK... found it.

The order says Daily, build list says daily, UPS label says "FL" which is fully loaded and would therefor exclude the "SPL" tolerences.

I am 99.9% sure that it is a daily sub. I know for a fact I havent machined any SPL cooled poles in a LONG time. Simply so few people need them (2 people I can ever remember doing them for and that was 10+ months ago).

Ill check with those that would have been involved with its build (for what thats worth I doubt they will remember it specifically as we do quite a few of them).... but Id rest assured that it is a daily version.

Sorry for the confusion...

Share this post


Link to post
Share on other sites
OK... found it.

The order says Daily, build list says daily, UPS label says "FL" which is fully loaded and would therefor exclude the "SPL" tolerences.

I am 99.9% sure that it is a daily sub. I know for a fact I havent machined any SPL cooled poles in a LONG time. Simply so few people need them (2 people I can ever remember doing them for and that was 10+ months ago).

Ill check with those that would have been involved with its build (for what thats worth I doubt they will remember it specifically as we do quite a few of them).... but Id rest assured that it is a daily version.

Sorry for the confusion...

Ok, thank you. Sorry for being a dumbass! haha I took that label all too seriously, which deeply effected thoughts in my head lol.

Share this post


Link to post
Share on other sites

yeah, the spiders they use are very stiff at first. when i got my sx reconed i couldn't even push the cone in, a month later though it was fine.

Share this post


Link to post
Share on other sites

Not a worry. Im not sure why but they simply must have marked on the wrong spot for that one. Was it with a blue marker over the SPL spot?

Share this post


Link to post
Share on other sites

Title edited for accuracy.

Share this post


Link to post
Share on other sites
Sign in to follow this  

×